15A NCAC 07M .0705 REVIEW PROCEDURES
Initial denials of mitigation projects, pursuant to the procedures of 15A NCAC 7M .0703(c), and permit denials, based on inconsistency with 15A NCAC 7H .0208, which are to be offset by mitigation proposals shall be reviewed by the CRC through the appeal procedures set forth in 15A NCAC 7J .0300.
History Note: Authority G.S. 113A‑102(b); 113A‑107; 113A‑113; 113A‑120(a); 113A‑124;
Eff. January 1, 1984;
Amended Eff. November 1, 1984;
Readopted Eff. October 1, 2022.